Project details

Client: Living Lab
Size: 8,800 sq. ft
Lead Contractor: M Moser Associates
Location: City of London
Duration: 10 weeks

Project description

Working in partnership with M Moser we were tasked with designing and constructing the new ” Living Lab” space as the new M Moser London HQ. The project was heavily focused on sustainability to drive the net zero ambitions of the business in all aspects of the design and materials used. Current Affairs worked in close collaboration throughout the project to achieve the overall goal of the Living Lab experience with the architectural team and the technical team. New lighting and lighting control technology were rolled out to allow the concept to come together. The space has been success following the opening with 82% of the team feeling more productive and a 20% uplift in attendance.