Project details

Client: Checkout.com
Size: 80,000 sq. ft
Lead Contractor: Modus Workspace
Location: Wenlock Works, Old Street
Duration: 20 weeks

Project description

Current Affairs were appointed to Deliver the new HQ for Checkout.com in Shoreditch. Following the initial design collaboration with the main contractor, Modus, we continued into the construction phase, delivering a CAT B fit out of over 80k sq. ft over 4 floors, all handed over within one phase. The design focused on a sleek, minimalistic aesthetic and drew inspiration from the building’s modern-industrial exterior, with an emphasis on exposed services. High levels of co-ordination were required to provided the seamless sleek design that was achieved. This was a flagship project for us at Current Affairs and our client, that we were proud to deliver on time to the highest of standards.