Project details
Project description
Current Affairs partnered with Loop Interiors to deliver a major CAT B fit-out within one of London’s most recognisable riverfront buildings. The project involved transforming an existing CAT B space into a contemporary, high-performance headquarters for HG Capital — all while the client remained in occupation.
A new central staircase was introduced to improve flow and connectivity between floors, supported by a full installation of new lighting and advanced lighting control systems. Feature lighting was carefully integrated throughout, with a large social and training suite positioned to take full advantage of the building’s iconic views of Tower Bridge and HMS Belfast.
The result – a modern, elegant workplace that blends high-end design with technical precision, delivered in a live environment with minimal disruption.