Client: Thirdway Interiors
Size: 40,000 sq ft
Location: Kensington, London
Duration: 28 Weeks

Project description

Current Affairs was appointed to deliver the full electrical installation for the transformation of One Derry Street, working with Thirdway Interiors to create a flagship commercial space in the heart of Kensington.

The 40,000 sq ft project involved a Shell to CAT A fit-out, including telecoms infrastructure, a building-wide fire alarm system, and advanced lighting controls. Key elements of the scheme included UKPN upgrades, end-of-journey facilities and roof terrace services – all delivered with a focus on quality, design and long-term reliability.

Close collaboration with the main contractor and consultants ensured that every stage was completed to the highest standards, resulting in a premium CAT A fit-out that sets the benchmark for future-ready office environments.